Turf Wicket Construction, Forbes NSW
The Green Horticultural Group have recently completed the construction of a 25m x 15m cricket wicket to replace an existing wicket, at Grinstead Oval in Forbes, NSW.
The scope of works included the following:
- Site survey to obtain necessary data
- Excavation to remove existing wicket
- Placement of DGB and compaction
- Placement of course sand layer and laser grading
- Supply and install drainage system to perimeter of wicket table
- Supply and installation of a plinth board to perimeter of new wicket table
- Supply, install, compact and laser grade existing cricket wicket soil and add new soil as required to achieve specified levels
- Supply and install washed Legend Couch to the wicket table and outer areas of the works
- Preparation for final handover to Council